With the rainy season approaching, the engineers decided that it would be best to improve on the rainwater system. The contractors installed a drain and a large pipe to remove rain but the slope of the back yard meant some rain would possibly pool against the building. A drainage canal was built along the side of the building out to the street on the east side by Engineer (and FAJB graduate) Kenneth Avendaño and his crew