The concrete walls are covered with two finishing layers. The first is a light cement, made from just the concrete mix and sand. The second coat is a fine plaster material that is known here as RepoMax. These were applied manually. Once these are dried the walls are ready for painting. All the walls should be finished with the RepoMax by March 17.